For domestic waste storage lot, medical waste lot, leakage water pool and roads, excavation and filling works have been completed. Similarly laying HDPE geo-membrane and geotextile isolation materials have also been completed. Works for the supply and application of natural clay, 16/32 drainage material and laying of 2.269 m HDPE leakage water have been carried out and delivered to Sivas Municipality Cleaning Works Directorate.