Muğla Eşen Creek 2nd Part Rehabilitation Work


  • Anahtar Atanmadı General Directorate Of State Hydraulic Works Muğla
  • Anahtar Atanmadı Muğla Eşen Creek 2nd Part Rehabilitation Work
  • Anahtar Atanmadı 18.07.2017
  • Anahtar Atanmadı
  • Anahtar Atanmadı Suiş Project and Engineering - Ensu Engineering - AFC Energy Consortium
  • Anahtar Atanmadı General Directorate Of State Hydraulic Works Muğla

In total 40,000 m3 quarry stone was used for the fortification and 338 meters of massive wall. In addition, the project includes two bridges construction. One of them has 2 spans and its length is 44.5 m and width is 12 m. The other bridge has 4 spans, its length is 82.6 m and its width is 12 m. Bridges will be used as a highway bridge.