Construction of Solid Waste Management Facilities In Lebanon Baalbek, Srar-Akkar and Joub Janine in 4 Lots


  • Anahtar Atanmadı The Office of the Minister of State for Administrative Reform, Beirut, LEBANON
  • Anahtar Atanmadı Construction of Solid Waste Management Facilities In Lebanon Baalbek, Srar-Akkar and Joub Janine in 4 Lots
  • Anahtar Atanmadı 15.09.2017
  • Anahtar Atanmadı
  • Anahtar Atanmadı
  • Anahtar Atanmadı EuropeAid

The project consists of 4 lots, identification for works at lots are:



Lot 1: construction of a sanitary landfill in Srar, Akkar



Lot 2: construction of a sanitary landfill in Baalbek



Lot 3: construction of a sanitary landfill in Joub Janine



Lot 4: construction of 2 steel hangars in Baalbek and Srar



Description of the project:



 • a sanitary landfill in Baalbek, Lebanon with a capacity of 1.000.000 m3,



• a steel hangar to house the sorting plant in Baalbek, Lebanon (about 3.300 m2),



• a sanitary landfill in Srar, Akkar, North Lebanon with a capacity of 1.000.000 m3,



• a steel hangar to house the sorting plant in Srar, Akkar (about 3.300 m2),



• concrete platform for composting and maturation (about 5.000 m2) part of the Srar, Akkar facility, and



• a sanitary landfill in Joub Janine, West Beqaa, Lebanon with a capacity of 54.000 m3.