The works carried out within the scope of the project are as follows:
- Compression and leveling of waste
- Transportation of wastes outside the rehabilitation boundaries to the main waste body
- Leachate drainage and collection system construction
- Construction of top cover impermeability system
- Highway and platform construction
- Construction of surface water drainage channels
- Landscape works
- Passive gas drainage wells and biofilter construction
- Observation wells construction