The works involving the following have been brought by us to successful completion: formation of 910.000 m³ solid waste storage reservoir on a land area of 108.000 m², construction of prefabricated administrative buildings, salt sludge lot, construction of leach / leakage water collection pool, 70.000 m³ of excavation fill work, insulation of the domestic waste lot and salt sludge lot with 41.000 m² of imported geosynthetic clay cover, 2 mm HDPE geomembrane and geotextile, supply, transport and spreading of 15.000 m³ of 16/32 drainage material, 0 – 64 sub-base and 0 – 32 upper base material, supply, and installation of Ø110 mm 1600 m HDPE pipe, supply and installation of fire water supply pipes and hydrants,installation of electrical and mechanical accessories, supply and installation of 60 ton capacity weighing scale for TIR trucks, supply of 250 kVA generator, supply of 1 unit of garbage compactor, 1 unit of excavator – loader, 1 unit of truck and supply of laboratory analysis devices. The job for the operation of the facility in compliance with the Regulation on the Control of Solid Waste was completed on 07.08.2009.